The project / The customer requirement

FrieslandCampina is one of the leading dairy companies in Germany. The increasing turnover frequency brought with it a need for warehouse expansion. The decision makers invested in the construction of a high-rack pallet warehouse in order to adjust the capacity at the production and distribution location in Heilbronn to the current demand situation. With the emphasis on designing a system with the highest degree of flexibility and efficiency while keeping the complexity as low as possible, Aberle was awarded the contract as general contractor.

A 1,080 m² construction space was available for implementing the high-rack warehouse under extreme weather conditions.

Within eight months, the intralogistics at Aberle completed the cold warehouse with interior temperature of +2 °C including roof and walls in silo style.